Lifecycle
- Send and follow: Send a draft to the authority, then follow it from the upload index to ok or nok and read the UIT code.
- UIT validity and timing: How early a transport can be declared, how many days a UIT code is valid for each operation type, and what the gateway refuses on each day.
- Change the vehicle: Replace the vehicle or a trailer: with a correction before the truck leaves, with a vehicle change once it is on the road.
- Correct and delete: Correct the data of an accepted declaration while the vehicle is still in the yard, or delete the declaration, each as a message to the authority.
- Confirm receipt: Say what arrived once the transport is finished: confirmed, partly confirmed or rejected, and what counts when nobody says anything.